schedules

length16565.3ftheat loss6.980965
flow rate100gpm
hazen williams coef100
diameter8in
static head109.81
head loss6980965
dynamic head102.81ft
actual pressure44.50649psi

1 comment:

  1. Organization- Out of order. Titles missing. Lots of things missing. 2/5

    Description- Missing. 0/5

    Bubble Diagrams- Missing. 0/5

    Sketches- Missing. 0/5

    Site plan- 5/5

    Renderings- 5/5

    Dimensioned Floor Plan- Missing. 0/5

    Elevations- 5/5

    Wall Section with labels- Not in a sheet. Lines are too thick. I can’t see the layers. 2/5

    Window and Door Schedule- Doors and windows are not tagged. 4/5

    Room Schedule with total square footage- Missing. 0/5

    Electrical Plan- 5/5

    Plumbing Plan with key- Missing. 0/5

    Water Supply Calculations- No explanation. 3/5

    Storm Water Runoff calculations- Missing. 0/5

    The things you actually posted were pretty good. Too bad this in no way shows the work you put in. 31/75